Investigate the root cause and set a remediation plan on the severity clock

How Leela would run itEvent-driven · investigation opens same day (Critical), 1 to 2 business days (High), 5 (Moderate), 15 to 30 days (Low); the plan follows the investigation
From the policy library
The requirement
The investigation opens the same business day for a Critical issue, within 1 to 2 business days for High, within 5 for Moderate, and typically within 15 to 30 days for Low. It establishes scope, root cause, impact, and whether a violation or regulatory notification is involved, and it is written up in an Issues Investigation Report. The remediation plan that follows records root cause, corrective action, owner, success criteria, and preventive measures, with remediation windows of 5 to 30 days for Critical, 10 to 30 business days for High, 30 to 60 for Moderate, and 60 to 90 for Low.
Applies
Tell Leela about your company to see whether this applies.
Status
Setup needed

Tell Leela how you handle it today, or hand it over: see what’s next.

The work

Open the investigation within the window for the rating, gather the facts, write the investigation report, then record the remediation plan in the log and share it with the affected parties.

What Leela keepsThe evidence this obligation leaves, as the work happens
Listed from the policy library
Contents
  1. 01
    Issues Investigation Report
    Facts, scope, root cause, impact, and violation assessment
  2. 02
    Remediation plan
    Root cause, corrective actions, owner, due dates, success criteria, preventive measures